Construction activity is bustling across Peel region highways, with numerous anticipated traffic delays and closures that will see “all lanes closed,” as per updates from the Ministry of Transportation.
Construction activity is bustling across Peel region highways, with numerous anticipated traffic delays and closures that will see “all lanes closed,” as per updates from the Ministry of Transportation.
The ministry has detailed both new and recurring closures on its 511 Ontario website for the upcoming week. Depending on their timing, drivers in Mississauga, Brampton, and Caledon may experience significant impacts. Here are some of the notable closures:
– The westbound express off-ramp of Highway 401 at Highway 403 in Mississauga will undergo construction, resulting in “all lanes closed” from 11:59 p.m. to 5 a.m. on July 14-18.
– Construction on the westbound QEW between Hurontario Street and Mississauga Road will result in the closure of two lanes from 11 p.m. to 6 a.m. on July 14-19.
– Maintenance work on the westbound QEW on-ramp at Highway 427 will necessitate the closure of “all lanes” from 11 p.m. to 5 a.m. on July 15-20.
– Construction on the eastbound express lanes of Highway 403 between Winston Churchill Boulevard and the Credit River bridge will lead to the closure of one lane from 11 p.m. to 5 a.m. on July 15-20.
– An engineering investigation on the northbound lanes of Highway 410 between Mayfield Road in Brampton and Valleywood Boulevard in Caledon will result in the closure of one lane from 9 p.m. to 7 a.m. on July 15-16.
Recent research by CAA South Central Ontario highlights concerns over distracted driving, with a significant number of Ontario drivers having witnessed close-call incidents or traffic violations attributed to this issue.
المزيد
1